Date: 27.10.2016 PDO
LTI 37 What happened A PDO Operator along with his assistant was to operate a valve on casing which was at a depth of 12 meter from the ground level for recommissioning of the well While removing a section of the grating frame the assistant operator
Embed this Presentation
Available Downloads
Download Notice
Download Presentation The PPT/PDF document "Date: 27.10.2016 PDO" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.