PPT-CCR Status, 1/31/2012

Author : cheryl-pisano | Published Date : 2016-03-05

Top Level Requirements Deliver properly configured periodic train of bunches to cooling channel at appropriate repetition rate 54 MeV Few mm mrad 001 x 1 cm 2

Presentation Embed Code

Download Presentation

Download Presentation The PPT/PDF document "CCR Status, 1/31/2012" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

CCR Status, 1/31/2012: Transcript


Download Document

Here is the link to download the presentation.
"CCR Status, 1/31/2012"The content belongs to its owner. You may download and print it for personal use, without modification, and keep all copyright notices. By downloading, you agree to these terms.

Related Documents